Home Sweet Dome
The life and love our home creation
Followers
Blog Archive
►
2010
(4)
►
May
(4)
▼
2009
(8)
▼
June
(8)
Garage Foundation
Electrical and Septic System
Garage foundation and cistern
Foundation poured
The foundation
Excavation begins 2005
The drawings
The Beginning 2001
Monday, June 15, 2009
Garage Foundation
So the backfilling is done and the garage is being tied in on both sides to create strength. Jon liked to play with his concrete machine also. He taught Sherif to blow out the sponge to the great delight of all the kids!
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment